Noida: Commuters in Noida are set to get a major boost to public transportation, with 100 new electric buses expected to hit the city’s roads soon. The Noida Authority has designated the City Bus Terminal in Sector 82 as the operating location for the proposed fleet. The initiative aims to strengthen public transport services and offer residents a more convenient, environmentally friendly commuting option. The buses will operate under the Gross Cost Contract (GCC) model.
Sector 82 terminal faces space constraints
However, operating 100 buses from the Sector 82 terminal has raised concerns about space availability. During an inspection, Uttar Pradesh State Road Transport Corporation (UPSRTC) officials reportedly found the terminal inadequate for handling a fleet of this size. Despite these concerns, the Noida Authority has decided to proceed with the Sector 82 terminal as the designated location for now.
Separate maintenance depot and charging stations required
The introduction of electric buses will also require dedicated infrastructure for charging and maintenance. Apart from ensuring the availability of buses, arrangements for their regular servicing and charging will be essential for smooth operations. A separate maintenance depot and charging stations are therefore planned. However, delays in land allocation have emerged as a hurdle in moving the project forward.
Government-level meeting scheduled on November 26
To address the pending issues related to land allocation and project preparedness, the Directorate of Urban Transport has called a government-level meeting on November 26. The meeting is scheduled for 4 pm through video conferencing.
Officials from the Noida Authority and Yamuna Expressway Industrial Development Authority (YEIDA) are also expected to participate in the meeting. The discussions are expected to focus on resolving infrastructure-related challenges and expediting preparations for the proposed electric bus services.
The introduction of 100 electric buses is expected to strengthen Noida’s public transport network. However, timely development of charging and maintenance infrastructure, along with addressing the space constraints at the Sector 82 terminal, will be crucial for the project’s successful implementation.

