
Ghaziabad : Commuters across Delhi-NCR could soon get a major public transport upgrade, with a proposed 72-km Namo Bharat corridor planned between Ghaziabad and Noida International Airport in Jewar. The corridor is expected to pass through several important residential and urban areas, including Greater Noida West, Surajpur, Greater Noida, Dadupur and Dankaur before reaching the airport. According to the proposed plan, the route will have 22 stations, providing improved connectivity for residents, daily commuters, working professionals and airport passengers. The project is particularly significant for Greater Noida West, where rapid residential development has increased the demand for better public transport infrastructure.
72-Km Corridor to Connect Ghaziabad With Jewar Airport
The proposed corridor will cover approximately 72 kilometres, linking Ghaziabad with Jewar Airport through key locations in Greater Noida and its surrounding areas. According to the project’s Detailed Project Report (DPR), approximately 71.5 km of the route will be elevated, while around 1.29 km will be underground. The elevated section is planned from Ghaziabad to Sector 30 of the Yamuna Expressway Industrial Development Authority (YEIDA) region. The underground section is proposed near Terminal 1 of Noida International Airport and the Ground Transportation Centre (GTC). This alignment is expected to provide a direct public transport link between major residential and commercial areas and the upcoming international airport.
Metro and Namo Bharat Trains to Run on the Same Corridor
One of the key features of the proposed project is its dual-operation system, under which Metro and Namo Bharat trains will operate on the same corridor. Of the 22 proposed stations, 11 will facilitate stops for both Metro and Namo Bharat services, while the remaining 11 will serve Metro trains only. Namo Bharat trains will stop at selected stations to enable faster long-distance travel, while Metro services will cater to passengers travelling between local destinations. This arrangement is expected to combine regional rapid transit with local connectivity and improve travel options for residents across the corridor.
₹21,000-Crore Project, Operations Targeted for 2030
The project is estimated to cost approximately ₹21,000 crore. According to the proposed timeline, the NCRTC is targeting the commencement of operations by 2030. Once completed, the corridor could significantly improve connectivity between Ghaziabad, Greater Noida West, Greater Noida and Jewar Airport. Residents of Greater Noida West, in particular, could benefit from better public transport options as the area continues to expand with new residential developments. Direct connectivity to Jewar Airport is also expected to make travel more convenient for passengers, business travellers and professionals. However, whether a particular residential society or neighbourhood will have a station nearby will depend on the final approved alignment and station locations. The proposed corridor could mark an important step towards strengthening public transport infrastructure across the rapidly developing NCR region.
